From Wikipedia, the free encyclopedia
High-priority Los Angeles infrastructure projects
The
Twenty-eight by '28
initiative is an effort set forth by former
Mayor
Eric Garcetti
that the
City of Los Angeles
complete 28 transportation infrastructure projects before the start of the
2028 Summer Olympics
on July 14, 2028
(
2028-07-14
)
and the
2028 Summer Paralympics
the following month.
Most projects are funded through
Measure R
and
Measure M
and will receive accelerated priority, though several more were proposed by this plan.
[1]
In December 2018, the
Los Angeles County Metropolitan Transportation Authority
stated it would need $26.2 billion to complete the list of projects.
[2]
List
[
edit
]
|
Under construction
|
|
Operational
|
Notes
[
edit
]
- ^
a
b
c
The project is not related to Measure R or Measure M.
- ^
Originally planned as a bus rapid transit line, but downgraded to local bus improvements.
References
[
edit
]
- General
- Inline
- ^
Sharp, Steven (27 November 2018).
"Here are the 28 Projects that Metro Could Complete Before the 2028 Olympics"
. Urbanize
. Retrieved
2 July
2018
.
- ^
Shelly, Susan (11 December 2018).
"Metro's latest plan to get more of your money"
. LA Daily News
. Retrieved
12 December
2018
.
- ^
Patel, Tine (October 7, 2022).
"LA Metro's new K Line opens today"
. CBS.
Archived
from the original on October 7, 2022
. Retrieved
October 7,
2022
.
- ^
"New 'Metro Micro' Rideshare Service Comes to LA Transportation"
. NBC4 Los Angeles. City News Service. 11 December 2020
. Retrieved
9 May
2023
.
- ^
Von Quednow, Cindy (June 16, 2023).
"Metro Regional Connector opens in Los Angeles, bringing more direct access to downtown"
.
KTLA
.
Nexstar Media Group
. Retrieved
June 16,
2023
.
- ^
@numble (May 16, 2023).
"March 2023 status report on LA Metro's LAX/Metro Transit Center (Airport Metro Connector). Construction is 39.9% done. Metro now proposes combining partial opening of station with opening of K Line south segment on 7/31/24 instead of first opening south segment in Fall 2023"
(
Tweet
) – via
Twitter
.
- ^
"North San Fernando Valley Transit Corridor"
. Los Angeles County Metropolitan Transportation Authority
. Retrieved
June 9,
2023
.
- ^
@numble (November 27, 2023).
"October 2023 status report for LA Metro's D Line Extension Section 1. 88.66% as of 10/27/23, +0.6% since 9/29/23. Contractor's forecast completion date is 6/17/25, 25 days later than last forecast"
(
Tweet
)
. Retrieved
November 28,
2023
– via
Twitter
.
- ^
Olga, Grigoryants (17 July 2018).
"LA's Metro says improvements are in the works for the Orange Line, with light rail in mind"
. Los Angeles Daily News
. Retrieved
17 July
2018
.
- ^
@numble (November 27, 2023).
"October 2023 status report for LA Metro's D Line Extension Section 2. 61.9% as of 10/27/23, +1.3% since 9/29/23. Contractor forecasts completion to be 6 days later than prior forecast (now late September 2026)"
(
Tweet
)
. Retrieved
November 28,
2023
– via
Twitter
.
- ^
Brock, James (2024-01-22).
"Foothill Gold Line Extension 81% Complete"
.
Los Angeles Business Journal
. Retrieved
2024-04-25
.
- ^
@numble (November 27, 2023).
"October 2023 status report for LA Metro's D Line Extension Section 3. 50.85% as of 10/27/23, +0.5% since 9/29/23"
(
Tweet
)
. Retrieved
November 28,
2023
– via
Twitter
.
- ^
Nelson, Laura (2 December 2019).
"Toll lanes in the Sepulveda Pass? The 405 Freeway is moving in that direction"
.
Los Angeles Times
. Retrieved
6 January
2021
.
- ^
"Mayor Garcetti checks out future train route through the Valley ? by bus"
. Los Angeles Daily News. 29 June 2018
. Retrieved
2 July
2018
.
- ^
@numble (November 27, 2023).
"October 2023 status report for LA Metro's East San Fernando Valley line. Contractor's initial schedule shows line opening at end of 2031, Metro is targeting summer 2031"
(
Tweet
)
. Retrieved
November 28,
2023
– via
Twitter
.
- ^
"LA Metro unveils rail concept for Sepulveda Pass project"
. Progressive Railroading. 12 June 2018
. Retrieved
2 July
2018
.
|
---|
Services
| | |
---|
Stations
| |
---|
Bus lanes
| |
---|
Capital projects
| Under construction
| |
---|
Planned
| |
---|
|
---|
Fleet
| |
---|
Other information
| |
---|