Shared-use path in Indianapolis, Indiana, U.S.
The
Pleasant Run Greenway
, also known as the
Pleasant Run Trail
, is a
shared-use path
in
Indianapolis
, Indiana. It runs for 6.9 miles (11.1 km) from
Ellenberger Park
, through Christian Park, to
Garfield Park
. It follows the general course of
Pleasant Run Creek
as it flows to the south and west. Most of the greenway is located within the parkway on one side or the other of the creek; the parkway itself is part of the historic
Indianapolis Park and Boulevard System
. In several places, the greenway is routed on sidewalks of city streets due to existing structures and facilities that make the parkway itself discontinuous.
Construction
[
edit
]
In 1994, the Indianapolis Department of Parks and Recreation presented the
Indianapolis Greenways Plan
to establish a system of linear parks consisting of 14 corridors; one of those was Pleasant Run. Construction of the greenway began in 1997 and was officially opened in August 1998.
[1]
Much of the greenway lies within the existing Pleasant Run Parkway; the parkway itself had been constructed in the 1920s as part of the
Indianapolis Park and Boulevard System
.
[2]
Most of the greenway is asphalt and is 5?12 feet (1.5?3.7 m) wide. Exceptions are in Ellenberger Park, where crushed limestone is used, and those places where the path uses existing sidewalks along streets.
[3]
Every quarter-mile is marked; the first marker in Ellenberger Park is mile 2 because of plans to extend the trail further east.
[
citation needed
]
Route
[
edit
]
The Pleasant Run Greenway starts in the southwest corner of Ellenberger Park in
Irvington
and follows the north bank of the creek west and south to the
Kin Hubbard
Memorial, a small park bounded by Emerson Avenue, New York Street, and Pleasant Run Parkway North Drive. From there the trail heads south along Emerson over the creek to
Washington Street
. It follows Washington Street west back across the creek and again runs along the north bank for a short distance until it turns south across Pleasant Run Parkway North Drive. A pathway to
Thomas Carr Howe Community High School
connects at that point. The greenway continues along the north bank until both it and the parkway cross the creek under the
CSX
(formerly
Baltimore and Ohio
) railroad bridge. At Brookville Road, the trail again crosses from the south bank to the north bank and passes through Christian Park, connecting with several paths within the park.
[
citation needed
]
At the intersection of English and Avon avenues, the Pleasant Run Greenway diverges from the creek and is routed along sidewalks on English Avenue to Pleasant Run Parkway North Drive. The greenway continues west between the parkway and the creek to Keystone Avenue, at which point it is again routed on sidewalks south on Keystone and east on Prospect Street until it again meets the creek. There are signs marking the trail in those locations where it uses city sidewalks.
[4]
From Prospect Street, the greenway runs along the north bank of Pleasant Run, passing by Orange Park. Near Spruce Street, a pedestrian bridge takes the trail to the south bank, where it continues in a westward direction under the
Interstate 65
bridge. At Shelby Street, the greenway intersects with a
cycle track
that connects with the
Indianapolis Cultural Trail
to the north. West of Shelby Street, the greenway turns south with the creek, passing through the southeast corner of the
Bates-Hendricks
neighborhood. South of Beecher Street, it travels under the
Indianapolis Belt Railroad
tracks and enters the north edge of
Garfield Park
, passing on a boardwalk under the Raymond Street bridge. The greenway ends at Pagoda Drive in the park, but several paths within the park connect with it.
[
citation needed
]
Future plans
[
edit
]
In 2021, the city began design work to extend the trail west from Garfield Park along the creek to Bluff Road, with an extension on Bluff Road north to Raymond Street and south to Troy Avenue. The new segments allow a future connection to the
Wapahani Trail
along the
White River
. Construction is scheduled to start in Spring 2023 and finish in late Fall 2023 and will cost $4 million. In the same time period, a $5 million project will rehabilitate and improve the existing segments of the trail between Garfield Park and Prospect Avenue and between English Avenue and Ritter Avenue.
[5]
An extension south and east from Ellenberger Park toward Arlington Avenue and the
Pennsy Trail
is in the city's long range plans.
[6]
A connector running north along the west side of Shelby Street to
Fountain Square
and the
Indianapolis Cultural Trail
was completed in 2011.
[
citation needed
]
See also
[
edit
]
References
[
edit
]
External links
[
edit
]