British construction, services and property group
Kier Group plc
is a British
construction
, services and
property
group active in
building
and
civil engineering
, support services, and the
Private Finance Initiative
.
Founded in 1928 in
Stoke-on-Trent
it initially specialised in concrete engineering before expanding into general contracting and house-building. Kier was listed as a public company on the
London Stock Exchange
from 1963 until it was acquired by
Beazer
in 1986. After a period under the ownership of
Hanson plc
, it was bought out by its management in 1992, expanded its housing interests, and was relisted on the London Stock Exchange in 1996.
During the early 21st century, it expanded through acquisitions, and, following the January 2018 collapse of rival
Carillion
, Kier was briefly ranked, by turnover, as the second biggest UK construction contractor, behind
Balfour Beatty
. It was then a constituent of the
FTSE 250 Index
. However, its share price plunged following a failed
rights issue
in late 2018, and by mid 2019 was suffering such deep losses that analysts considered Kier might "go bust".
[3]
[4]
After an extensive restructuring, debt reduction, cost-cutting and disposals programme, which included shedding 1,700 employees and selling its Bedfordshire headquarters and its public and private housebuilding arm, Kier Living, the company scraped back into profit in 2021. It remains listed on the
London Stock Exchange
and is a constituent of the
FTSE 250 Index
.
History
[
edit
]
Foundation
[
edit
]
The company was founded by Jorgen Lotz and
Olaf Kier
,
Danish
engineers, under the name
Lotz & Kier
in 1928, and it was based in
Stoke-on-Trent
.
[5]
A few years later Lotz withdrew from the company, but Olaf Kier retained a semblance of his identity by including Lotz's initials in the organisation's new name,
J.L. Kier & Co Ltd
, which remained the company's principal title for over four decades.
[6]
Pre-World War II
[
edit
]
By the late 1930s Kier had moved its head office to
Belgravia
in
Westminster
, and thereby became neighbours to many of Britain's leading construction engineering consultants and contractors, who had formed a substantial coterie in Westminster for professionals and businessmen engaged in civil engineering. Immediate neighbours included Marples Ridgeway (builders of
Hammersmith Flyover
) and
Edmund Nuttall
(builders of both
Mersey road tunnels
).
[7]
Concrete engineering
[
edit
]
During its first 35 years, Kier became identified with certain civil engineering specialisms, such as contiguous cylindrical reinforced concrete grain silos and cement silos, using continuously sliding formwork; commencing with those at Barking in 1929, followed by grain silos at Northampton, Peterborough, Melksham, Gloucester and Witham; and cement silos at Norwich, Cambridge, Trinidad, and in India.
[8]
Such specialist work was part of a pattern that quickly developed in the company's operations during that period, namely the undertaking of innovative civil engineering techniques. Other elements within this pattern were hyperbolic natural draft cooling towers (mostly around 300 ft high),
[9]
monolithic concrete chimneys (sometimes over 400 ft high),
[10]
complete power station structures,
[11]
and coastal works such as tanker berths, docks and harbours.
[12]
Corner detail of
Highpoint I
, showing balcony profiles.
In the same period, only this time in the building sector, Kier were in the vanguard of new reinforced concrete systems for use as framework for tall buildings. Their most famous contribution in this field was an eight-storey
avant-garde
development of apartment blocks named
Highpoint
, located in
Highgate Village
, north London. They were responsible for the reinforced concrete and general building.
[13]
When this project was completed in 1935 it became widely renowned as the finest example of this form of construction for residential purposes. When
Le Corbusier
himself visited Highpoint in 1935 he said, "This beautiful building .... at Highgate is an achievement of the first rank."
[14]
And American critic
Henry Russell Hitchcock
called it, "One of the finest, if not absolutely the finest, middle-class housing projects in the world"
[14]
(in 1970 both Highpoint blocks were classified Grade I
listed buildings
).
[15]
Kier dynasty
[
edit
]
Olaf Kier sought to retain family leaders at the head of the organisation. However, his son by his first marriage was killed in a riding accident in 1945. Then, during the 1950s, Olaf's nephew, Mogens Kier, joined the firm's management structure, but did not progress to a leading position in the company. Olaf died in an accident in 1986, aged 87; and Mogens died in 2003.
[16]
Post-World War II
[
edit
]
J.L. Kier & Co Ltd remained a private company until 1963, when it obtained a listing on the
London Stock Exchange
and became a public company. Its offer for shares was many times oversubscribed. The Kier family retained a significant majority of the holding. In 1973 Kier merged with
W. & C. French
to form
French Kier
but within the French division there were heavy losses on fixed-price motorway contracts and land development. A long-serving Kier engineer, John Mott, was appointed chief executive in order to revive the group's fortunes. Following an abortive bid for Abbey in 1985, French Kier itself was the subject of a hotly contested bid by
Beazer
, which eventually succeeded in January 1986.
[17]
Five years later (1991)
Hanson plc
bought Beazer plc
[18]
and made an early decision to dispose of the contracting arm, now known simply as
Kier
. This was the subject of a
management buyout
in July 1992,
[19]
with Hanson retaining a 10 per cent stake.
[20]
In 1993 Kier decided to re-enter the housing market with the £30m acquisition of Twigden Homes. This was followed by acquisitions of the southern division of Miller Homes in 1996, Bellwinch in 1998, and Allison Homes in 2001. By 2004, Kier housing sales were over 1,000 units a year.
[17]
Kier was listed on the London Stock Exchange in 1996.
[21]
21st century
[
edit
]
In 2009, Mivan Kier, Kier's Romanian joint venture with the Northern Irish group Mivan, which invested in real estate projects in Bucharest, requested
bankruptcy protection
due to debts of €20 million.
[22]
[23]
Kier branded vehicle
In 2013, Kier acquired the services firm May Gurney for £221 million,
[24]
becoming the then fourth largest contracting firm in the UK (behind
Balfour Beatty
,
Carillion
and
Laing O'Rourke
).
[25]
In June 2015 Kier completed the acquisition of
Mouchel
, a business which included infrastructure services and business services divisions, for £265 million;
[26]
Mouchel Infrastructure Services was rebranded as Mouchel Consulting, and sold to
WSP Global
in October 2016. In July 2017 Kier acquired McNicholas Construction, another UK infrastructure services provider.
[27]
Based on its turnover in the year ending June 2017, Kier was ranked in 2018 as the second biggest UK construction contractor, behind
Balfour Beatty
.
[28]
2018?2021 financial difficulties
[
edit
]
After the liquidation of rival Carillion in January 2018, Kier took on some Carillion staff and contracts: 150 Carillion workers employed on
smart motorway
joint ventures became Kier employees; 51 Carillion employees working on seven
HS2
civil engineering packages awarded to the CEK joint venture were allowed to join Kier/
Eiffage
.
[29]
[30]
[31]
However, because Kier shared characteristics that contributed to Carillion's collapse ? problem contracts, rising debts, and use of
reverse factoring
supply chain finance ? City
hedge funds
began to '
short
' Kier's shares; 10.9% were shorted by 30 August 2018,
[32]
later rising to 18%,
[33]
though Kier's position was not seen to be as risky as Carillion's.
[34]
The 2018 results were in line with City expectations ? showing a pre-tax profit of £137m from stable revenue of £4.5 billion ? with Kier outlining clear debt reduction plans.
[35]
[36]
On 15 November 2018, Kier announced the £24m sale of its Australian road assets business KHSA to joint venture partner
Downer
, saying sale proceeds would help reduce net debt
[37]
? £624m at 31 October 2018.
[38]
However, on 30 November, Kier announced a £264m
rights issue
, priced at 409p, to pay down net debts;
[38]
the announcement led to Kier shares dropping almost 33%,
[39]
cutting Kier's stock market value by £329m to £492m.
[40]
The slide continued;
[41]
on 3 December shares were trading around 40% lower than before the rights issue announcement.
[42]
On 5 December, Kier was demoted from the
FTSE 250 Index
,
[43]
and its share price dropped below the rights issue price,
[44]
[45]
making it cheaper for investors to buy shares in the open market than in the rights issue, and leaving underwriters (
Numis
, Peel Hunt,
Citigroup
,
HSBC
and
Santander
) facing losses. Shares were also subject to renewed 'shorting'.
[46]
On 10 December, shares closed at 376.4p, a 15-year low.
[47]
Only 38% of the rights issue was taken up, with shares still trading below the rights issue price, at 385p, on 19 December.
[48]
Following the failed rights issue,
[49]
shares fell by 13% to a 15-year low of 335p, but later recovered.
[50]
[51]
They were trading at 529p on 11 January 2019, when some shareholders sought changes in Kier's leadership team.
[52]
CEO Haydn Mursell subsequently resigned on 22 January
[53]
(his successor, former
Wates Group
CEO
Andrew Davies
,
[54]
took up the post on 15 April 2019).
[55]
In a trading statement Kier said the rights issue had helped reduce year-end net debt to £130m compared with £239m at the end of the previous year; average month-end net debt for the six months to 31 December 2018 was £370m, as compared with £410m for the previous six months.
[56]
On 28 January 2019, Kier shares dropped 4% after reports it would sell its housing maintenance arm to cut debt,
[57]
and the company was also reducing its waste management activities.
[58]
On 11 March 2019, Kier revised its average net debt for the six months to December 2018 by over £50m from £130m to £180.5m, raising average month-end net debt over the period from £370m to £430m. These revisions followed £10.3m in adjustments to the group's hedging activities, and £40.2m in relation to development assets held for resale. It also warned of £25m of additional costs on its
Broadmoor Hospital
redevelopment. Shares fell by 12% to 437p.
[59]
[60]
(Kier's auditor
PwC
was later investigated by the
Financial Reporting Council
over a £40m accounting error,
[61]
and in June 2022 was fined £1.96m for failing to adequately challenge revenue and costs recognised by Kier's management on large, complex long-term construction contracts.
[62]
)
On 20 March 2019, Kier's half-year results showed a pre-tax loss of £35.5m in the second half of 2018 with revenues flat at £2,064m. As well as the Broadmoor provision, Kier lost £26m on a disputed waste collection contract, while integrating the McNicholas business and Kier restructuring added a further £15.4m to costs. Kier also highlighted "volume pressures" in its highways, utilities and housing maintenance markets.
[63]
In a 3 June 2019 profit warning, Kier said operating profits would be £25m lower than previously expected,
[64]
causing its share price to fall over 40%
[65]
? trading at about 150p, less than half the rights issue price, on 6 June.
[66]
Shares fell by over a third on 14 June, closing at 130.8p, after reports that Kier was looking to sell its housebuilding division.
[67]
On 17 June, Kier confirmed the housing division sale, plans to wind down its property business, and a planned exit of the facilities management and environmental services markets. CEO Andrew Davies's business review included 1,200 job cuts.
[68]
Kier's share price fell 17% to 108p, a level not seen since the company's 1996 flotation,
[69]
and its shares were subject to renewed 'shorting' with one analyst saying "the consensus in the market is that Kier will go bust";
[3]
[4]
on 15 July 2019, Kier shares were the most 'shorted' on the London Stock Exchange, with shares falling 12.7% to 72.95p.
[70]
Amid concerns about Kier's future, the company was dropped from two major development schemes, in Leeds and London.
[71]
In a trading update on 1 August 2019, Kier said average month-end net debt for the 2019 financial year was £422 million, with revenues £100m lower, and, after significant interest in its housing division, said it had started the sale process
[72]
(
Guy Hands
'
Terra Firma Capital Partners
was later reported to be among the bidders to acquire Kier Living).
[73]
It also announced the appointment of a new CFO, Simon Kesterton (adept at "the disposal of non-core assets, the reduction of overheads and cost control"), with effect from 19 September 2019.
[72]
[74]
Entrance to Tempsford Hall
On 19 September 2019, Kier announced a £245m pre-tax loss on revenues of £4.5bn for the year to 30 June 2019, resulting from £341m in impairment costs and write-downs related to preparing businesses for sale, restructuring and loss-making contracts. The continuing restructuring had resulted in over 751 lay-offs, with a further 450 roles set to be axed.
[75]
Group chairman Philip Cox stepped down,
[76]
replaced by former Royal Mail FD Matthew Lester from 1 January 2020.
[77]
In October 2019, Kier announced it was selling its
Tempsford Hall
headquarters in Bedfordshire to raise cash from its property assets.
[78]
At the group's AGM in November 2019, shareholders objected to CEO Andrew Davies's £2.6m annual remuneration package and an associated long-term incentive scheme.
[79]
Half-year results announced on 5 March 2020 showed Kier made a pre-tax loss of £41.2m in the final six months of 2019 (marginally better than 2018's restated £45.3m loss); revenues were down 9% to £1,866m (2018: £2,053m). The cost-cutting process begun in 2018 had cut 1,200 jobs with another 50 set to leave by 30 June 2020. The sale of Kier Living was in progress, as was the process of closing Kier's Tempsford Hall head office,
[80]
set to complete in June 2020.
[81]
On 24 March 2020, as the financial impacts of the
COVID-19 pandemic
became clear, Kier's board of directors took a three-month 20% pay cut,
[82]
then, on 30 March, announced all 6,500 Kier employees would have their base salary reduced by between 7.5% and 25% for three months; it stepped up its cost reduction programme, bringing forward the closure of Tempsford Hall to 30 April
[83]
(head office functions were transferred to Manchester in mid April),
[1]
and paused the sale of its housebuilding business, Kier Living
[84]
(though Terra Firma revived talks about buying Kier Living in December 2020).
[85]
Kier also closed its
Reading
office with the loss of up to 40 jobs.
[86]
On 1 July 2020, Kier announced it was considering a further rights issue to raise cash as average net debt had risen due to COVID-19 impacts; average month-end net debt was up from £395m in December 2019 to £440m, and could rise to £485m.
[87]
Further job cuts were also likely.
[88]
On 17 September 2020, Kier announced a £225.5m loss on the year to 30 June 2020, on revenues down 15% to £3,476m. The fall was partly due to COVID-19 impacts as well as 'challenging' market conditions throughout the year. Group headcount had been reduced by 1,700.
[89]
Following this announcement, Kier shares sagged to 51.40p.
[90]
In a January 2021 trading update, Kier said average monthly net debt remained around £436m; progress with the sale of Kier Living continued, with Kier hoping to receive around £100m for the business to help reduce debt; and Kier was aiming to make at least £105m in cost savings by the end of the financial year.
[91]
Kier Living's sale came ahead of the company's (delayed) half-year results in April 2021.
[92]
On 6 April,
Sky News
reported that Kier Living would be sold to Terra Firma,
[93]
for £110m, subject to agreement at a meeting of Kier shareholders in early May, with completion of the sale by mid-June 2021.
[94]
Kier Living was bought by a new company owned by Terra Firma founder Guy Hands,
[95]
and was rebranded as
Tilia Homes
.
[96]
However, the sale would not significantly improve Kier's debt position, and analysts predicted an equity raise;
[97]
on 21 April 2021, CEO Davies confirmed a planned equity raise to address its net debt position, unchanged at £436m.
[98]
On 13 May 2021, Kier launched a £241m fund raise, with shares offered at 85p (a 17% discount to their then trading price).
[99]
2022?2024: Return to profitability
[
edit
]
Following a successful £241m capital raise and Kier Living's sale, in September 2021, Kier announced it had scraped back into profitability, reporting a pre-tax profit of £5.6m in the year to 30 June 2021 on turnover of £3,329m.
[100]
In a January 2022 trading update, Kier said it had more than halved its net debt from around £436m to below £200m, and was on track to meet a medium term revenue target of £4-£4.5bn.
[101]
Also in January 2022, Kier was reported to be in advanced talks to acquire rival contractor
Tilbury Douglas
, the remaining contracting arm of the former
Interserve
group,
[102]
with speculation it might pay around £50m for the almost-£500m turnover business.
[103]
However, Kier discontinued negotiations in March 2022.
[104]
In the November 2022 company AGM, 44% of Kier shareholders voted against the directors' pay report after CEO Andrew Davies’ pay package jumped by around 70%. His total pay rose to £2.245m for 2022 from £1.323m in 2021.
[105]
In September 2023, it was announced Kier had acquired the rail division of the
UK
construction company,
Buckingham Group
- which went into
administration
in August 2023. Buckingham's rail assets and its
HS2
contract were purchased for £9.6 million.
[106]
In a January 2024 trading update, Kier said it had cut average month-end net debt by around £100m to £140m, the lowest level in over five years. Its order book at the end of 2023 was up 6% to £10.7bn from June 2023 having secured 92% of forecast revenue.
[107]
Kier shares were set to return to the FTSE 250 Index in March 2024.
[108]
A March 2024 trading update reported revenues of £1.9bn, reported profit from operations up 15% to £44m, and average month-end net debt reduced to £136m from £242m in the same prior period. The company resumed dividend payments for the first time in five years.
[109]
Operations
[
edit
]
From August 2021, the UK company has had four regional divisions (London, South & Strategic Projects; Midlands & Eastern; Western & Wales; North & Scotland), plus Kier Places (housing maintenance and facilities management).
[110]
Major projects
[
edit
]
Projects involving the company have included
Highpoint I
completed in 1935,
[111]
the North Terminal at
Gatwick Airport
completed in 1988,
[112]
the
Lesotho Highlands Water Project
completed in 1998,
[113]
Hairmyres Hospital
completed in 2001,
[114]
High Speed 1
completed in 2007,
[115]
the
Castlepoint shopping centre
in
Bournemouth
in 2003,
[116]
the
UK Supreme Court
in
London
completed in 2009
[117]
and
Snowhill Phase 2
in
Birmingham
completed in 2009.
[118]
Kier Group is also involved in
HS2
lots C2 and C3, working as part of a joint venture with Eiffage, due to complete in 2031.
[119]
Controversies
[
edit
]
Kier was revealed as a subscriber to the UK's
Consulting Association
, exposed in 2009 for operating an illegal construction industry
blacklist
, and was among 14 issued with enforcement notices by the UK
Information Commissioner's Office
.
[120]
Subsequently, Kier was among eight businesses involved in the 2014 launch of the Construction Workers Compensation Scheme,
[121]
condemned as a "PR stunt" by the
GMB union
, and described by the
Scottish Affairs Select Committee
as "an act of bad faith".
[122]
In December 2017, Unite announced it had issued high court proceedings against four former chairmen of the Consulting Association, included Danny O'Sullivan of Kier, alleging breach of privacy, defamation and Data Protection Act offences.
[123]
Unite also said it was taking action against 12 major contractors including Kier.
[124]
Following a devastating fire in the
Glasgow School of Art
's Mackintosh Building on 15 June 2018, the school terminated its £25 million restoration contract with Kier on 29 June 2018.
[125]
Kier was the main contractor in the failed DG One leisure centre in
Dumfries
.
[126]
In October 2018, Kier was named as a 'poor payer' at a Parliamentary inquiry into small businesses, failing to pay 48% of invoices due within their agreed terms, leading some suppliers to refuse to work for the company.
[127]
In November 2019, Kier and subsidiary McNicholas Construction Services were suspended from the Prompt Payment Code for "failing to honour a commitment to pay 95% of all supplier invoices within 60 days".
[128]
Kier Construction was reinstated in December 2019;
[129]
Kier Highways and Kier Infrastructure & Overseas were reinstated in June 2020;
[130]
Kier Integrated Services was reinstated in August 2020,
[131]
but McNicholas Construction Services remained suspended until December 2020.
[132]
In May 2022, Kier was criticised by councillors for quoting "unaffordable" prices for simple highway maintenance roadworks in
Suffolk
.
[133]
Kier workers operating machinery on a project on the
M6 motorway
near
Sandbach
,
Cheshire
twice brought down overhead powerlines, in incidents in March 2018 and January 2019. In January 2023, the company was fined £4.4m after pleading guilty to safety breaches at Manchester Crown Court.
[134]
In June 2023, Kier subsidiary McNicholas Construction was named for failing to pay staff the UK legal minimum wage. It was among the 10 worst offenders, failing to pay £170,517.57 to 704 workers.
[135]
References
[
edit
]
- ^
a
b
"Kier moves north"
.
The Construction Index
. 18 April 2020
. Retrieved
20 April
2020
.
- ^
a
b
c
d
"Annual Results 2023"
(PDF)
. Kier Group
. Retrieved
18 February
2024
.
- ^
a
b
Ing, Will (21 June 2019).
"Asset managers up bets against Kier share price"
.
Building
. Retrieved
21 June
2019
.
- ^
a
b
Loomes, Karl (25 June 2019).
"Could Kier Group go bust?"
.
Motley Fool
. Retrieved
26 June
2019
.
- ^
Jones, Peter H.; Jones, Peter; Peter Jones, PH D.; Arup, Ove Nyquist (2006).
Ove Arup, Masterbuilder of the 20th Century by Peter Jones, Page 54
.
ISBN
0300112963
. Retrieved
2 December
2008
.
- ^
"J. L. Kier and Co"
. Grace's Guide
. Retrieved
18 September
2018
.
- ^
"Obituary: Sir Nicholas Nuttall"
.
Liverpool Daily Post
. 9 August 2007. Archived from
the original
on 23 November 2008
. Retrieved
18 September
2018
.
- ^
pps 28 & 29, Kier Corporate Blue Book, 1955 Edtn
- ^
pps 17-19, Kier Corporate Blue Book, 1955 Edtn
- ^
p 16, Kier Corporate Blue Book, 1955 Edtn
- ^
pps 11-14, Kier Corporate Blue Book, 1955 Edtn
- ^
pps 3-7, Kier Corporate Blue Book, 1955 Edtn
- ^
pps 44 & 45, Kier Corporate Blue Book, 1955 Edtn
- ^
a
b
"Highpoint One"
.
OpenLearn
. Retrieved
22 March
2015
.
- ^
"Buildings of Historic or Architectural Interest"
.
Parliamentary Debates (Hansard)
. 3 February 1970
. Retrieved
22 March
2015
.
- ^
Kierlink
Archived
22 July 2011 at the
Wayback Machine
- ^
a
b
Wellings, Fred:
Dictionary of British Housebuilders
(2006) Troubador.
ISBN
978-0-9552965-0-5
- ^
Jonathan P. Hicks (17 September 1991).
"COMPANY NEWS; Hanson to Buy Beazer In $609 Million Deal"
.
The New York Times
. Retrieved
18 August
2008
.
- ^
Connon, Heather (7 July 1992).
"Hanson sells contract firms"
.
Independent
. Retrieved
18 September
2018
.
- ^
"Buy out, yes. Sell out, no"
. Contract Journal. 7 April 1994
. Retrieved
18 August
2008
.
[
permanent dead link
]
- ^
Kier Group
London Stock Exchange
- ^
"Mivan Kier JV declares insolvency"
,
Bucharest Business Review
, 9 August 2009
- ^
"Vand avans de locuin??"
,
Evenimentul Zilei
, 8 September 2009
- ^
Kier completes £221m deal for May Gurney
The Courier
- ^
May Gurney joins Kier Group
Construction Index, 8 July 2013
- ^
Paton, Elizabeth (28 April 2015).
"Kier confirms Mouchel takeover"
.
Financial Times
.
ISSN
0307-1766
. Retrieved
25 November
2015
.
- ^
"Kier buys £180m-turnover McNicholas"
. Construction News. 13 July 2017
. Retrieved
13 March
2018
.
- ^
Menary, Steve (22 September 2018).
"TCI Top 100 Construction Companies 2018"
.
The Construction Index
. Retrieved
24 September
2018
.
- ^
"Kier takes on Carillion JV staff"
.
The Construction Index
. 22 January 2018
. Retrieved
22 January
2018
.
- ^
Morby, Aaron (22 January 2018).
"Kier saves 200 Carillion staff jobs to complete JVs"
.
Construction Enquirer
. Retrieved
22 January
2018
.
- ^
Rhiannon Curry (22 January 2018).
"Kier takes on Carillion staff for HS2 and motorways work"
. Telegraph.co.uk
. Retrieved
7 July
2018
.
- ^
GCR staff (5 September 2018).
"Carillion short sellers now targeting Kier"
.
Global Construction Review
. Retrieved
18 September
2018
.
- ^
Sheldon, Edward (18 September 2018).
"Remember Carillion's collapse? Could this Neil Woodford-owned stock be next?"
.
Motley Fool
. Retrieved
19 September
2018
.
- ^
"Kier vs. Carillion - what can we learn?"
.
Tussell
. Retrieved
19 September
2018
.
- ^
Morby, Aaron (20 September 2018).
"Kier targets £50m disposals to cut £375m debt"
.
Construction Enquirer
. Retrieved
20 September
2018
.
- ^
Vincent, Matthew (20 September 2018).
"Opening Quote: Kier determined not to be the next Carillion"
.
Financial Times
. Retrieved
20 September
2018
.
- ^
Morby, Aaron (15 November 2018).
"Kier raises £24m from Australian road business sell-off"
.
Construction Enquirer
. Retrieved
15 November
2018
.
- ^
a
b
Prior, Grant (30 November 2018).
"Rising debts force Kier to launch £264m rights issue"
.
Construction Enquirer
. Retrieved
30 November
2018
.
- ^
"London Market Close: FTSE 100 Ends Week In Red As G20 Summit Kicks Off"
.
Morning Star
. 30 November 2018
. Retrieved
30 November
2018
.
- ^
Davies, Rob (30 November 2018).
"Kier construction shares lose 30% on plan to raise cash"
.
Guardian
. Retrieved
2 December
2018
.
- ^
Bow, Michael (3 December 2018).
"Market report: Kier still on the ropes after shares suffer second knockdown"
.
Evening Standard
. Retrieved
3 December
2018
.
- ^
Champ, Hamish (4 December 2018).
"Kier's shares plummet further in wake of rights issue"
.
Building
. Retrieved
4 December
2018
.
- ^
Bhunjun, Arvind (5 December 2018).
"Top News: Hiscox and Spirax-Sarco Engineering Promoted to FTSE 100"
.
LSE Alliance News
. Retrieved
5 December
2018
.
- ^
Donnellan, Aimee (5 December 2018).
"Tough Rump"
. Reuters
. Retrieved
6 December
2018
.
- ^
Morby, Aaron (6 December 2018).
"Kier drops out of FTSE 250 as share price dives"
.
Construction Enquirer
. Retrieved
6 December
2018
.
- ^
Wilson, Harry (7 December 2018).
"Kier shares sink below price set for rights issue"
.
Times
. Retrieved
9 December
2018
.
- ^
Ralph, Alex (11 December 2018).
"Falling share price piles pressure on ailing Kier"
.
Times
. Retrieved
11 December
2018
.
- ^
Morby, Aaron (20 December 2018).
"Underwriters hit as Kier £250m rights issue flops"
.
Construction Enquirer
. Retrieved
20 December
2018
.
- ^
"Kier rights issue fails to attract investors"
. Investors Chronicle. 24 December 2018
. Retrieved
21 October
2019
.
- ^
Hodgson, Camilla (20 December 2018).
"Less than 40% of shareholders take up Kier rights issue"
.
Financial Times
. Retrieved
20 December
2018
.
- ^
Davies, Rob (20 December 2018).
"Kier investors shun efforts to raise £264m in funds"
.
Guardian
.
- ^
Prior, Grant (14 January 2019).
"Shareholders pushing for Kier chiefs to be ousted"
.
Construction Enquirer
. Retrieved
14 January
2019
.
- ^
22 January 2019.
"Kier CEO Haydn Mursell resigns"
.
Construction News UK
. Construction News
. Retrieved
19 May
2023
.
{{
cite web
}}
: CS1 maint: numeric names: authors list (
link
)
- ^
Kleinman, Mark (18 March 2019).
"Embattled Kier picks chief left stranded by Carillion collapse"
.
Sky News
. Retrieved
18 March
2019
.
- ^
Maatouk, Michele (19 March 2019).
"Kier appoints Andrew Davies as new CEO"
.
Sharecast
. Retrieved
23 March
2019
.
- ^
Morby, Aaron (22 January 2019).
"Kier chief Haydn Mursell exits"
.
Construction Enquirer
. Retrieved
22 January
2019
.
- ^
Daniel, Alex (28 January 2019).
"Kier shares fall again as investors react to reports it will sell housing maintenance arm to cut debt"
.
City AM
. Retrieved
31 January
2019
.
- ^
Morby, Aaron (28 January 2019).
"Kier in talks to sell housing maintenance arm"
.
Construction Enquirer
. Retrieved
31 January
2019
.
- ^
Morby, Aaron (11 March 2019).
"Kier in shock debt restatement"
.
Construction Enquirer
. Retrieved
11 March
2019
.
- ^
"Kier admits to higher debts and Broadmoor losses"
.
The Construction Index
. 11 March 2019
. Retrieved
11 March
2019
.
- ^
Prior, Grant (8 February 2022).
"Accountant facing probe over Galliford Try and Kier audits"
.
Construction Enquirer
. Retrieved
8 February
2022
.
- ^
Morby, Aaron (7 June 2022).
"PwC handed £5m fine for Kier and Galliford Try audits"
.
Construction Enquirer
. Retrieved
7 June
2022
.
- ^
Prior, Grant (20 March 2019).
"Kier slumps to £35.5m loss as problem contracts continue"
.
Construction Enquirer
. Retrieved
20 March
2019
.
- ^
Prior, Grant (3 June 2019).
"Kier in profit warning as problems spread to building division"
.
Construction Enquirer
. Retrieved
3 June
2019
.
- ^
Karunaratne, Nilushi (5 June 2019).
"Kier woes point to restructuring"
.
Investors Chronicle
. Retrieved
6 June
2019
.
- ^
Head, Roland (6 June 2019).
"Investors are taking a gamble on the Kier share price: here's what I'd do"
.
Motley Fool
. Retrieved
6 June
2019
.
- ^
Hickey, Shane (14 June 2019).
"Kier shares plunge on report it wants to sell housing division"
.
Guardian
. Retrieved
16 June
2019
.
- ^
Prior, Grant (17 June 2019).
"Kier cutting 1,200 jobs and selling housing arm"
.
Construction Enquirer
. Retrieved
18 June
2019
.
- ^
Kollewe, Julia; Davies, Rob (17 June 2019).
"Kier Group to cut 1,200 jobs in attempt to avoid collapse"
.
Guardian
. Retrieved
18 June
2019
.
- ^
Daniel, Alex (15 July 2019).
"Short sellers circle Kier Group as contractor's turmoil continues"
.
City AM
. Retrieved
19 July
2019
.
- ^
Morby, Aaron (24 July 2019).
"Kier dropped from major Leeds and London schemes"
.
Construction Enquirer
. Retrieved
24 July
2019
.
- ^
a
b
Prior, Grant (1 August 2019).
"Kier close to selling housing division"
.
Construction Enquirer
. Retrieved
1 August
2019
.
- ^
Kleinman, Mark (9 December 2020).
"Tycoon Hands wants to build new home with ailing Kier"
.
Sky News
. Retrieved
7 January
2020
.
- ^
"Kier Group plc: Appointment of Chief Financial Officer"
.
London Stock Exchange
. Retrieved
1 August
2019
.
- ^
Morby, Aaron (19 September 2019).
"Kier plunges to £245m loss"
.
Construction Enquirer
. Retrieved
20 September
2019
.
- ^
Kollewe, Julia (19 September 2019).
"Kier warns of Brexit fallout after £245m loss"
.
Guardian
. Retrieved
20 September
2019
.
- ^
Morby, Aaron (16 December 2019).
"Kier names new chairman"
.
Construction Enquirer
. Retrieved
16 December
2019
.
- ^
Morby, Aaron (25 October 2019).
"Kier to sell historic country HQ to pay down debt"
.
Construction Enquirer
. Retrieved
15 November
2019
.
- ^
Morby, Aaron (16 November 2019).
"Kier suffers shareholder revolt over chief's pay"
.
Construction Enquirer
. Retrieved
18 November
2019
.
- ^
"Kier still losing money"
.
The Construction Index
. 5 March 2020
. Retrieved
5 March
2020
.
- ^
Rogers, Dave (9 March 2020).
"Kier to leave historic home this June"
.
Building
. Retrieved
9 March
2020
.
- ^
Morby, Aaron (24 March 2020).
"Kier board takes 20% pay cut for three months"
.
Construction Enquirer
. Retrieved
24 March
2020
.
- ^
"Kier cuts salaries by up to 25%"
.
The Construction Index
. 30 March 2020
. Retrieved
30 March
2020
.
- ^
Price, David (30 March 2020).
"Kier pauses sale of housebuilding arm and cuts salaries"
.
Construction News
. Retrieved
30 March
2020
.
- ^
Kleinman, Mark (2 December 2020).
"Hands up for fresh effort to build future with Kier Living"
.
Sky News
. Retrieved
3 December
2020
.
- ^
Morby, Aaron (1 April 2020).
"Kier closes Reading office with over 40 job losses"
.
Construction Enquirer
. Retrieved
1 April
2020
.
- ^
Morby, Aaron (1 July 2020).
"Kier eyes rights issue as debt rises to £440m"
.
Construction Enquirer
. Retrieved
1 July
2020
.
- ^
Price, David (1 July 2020).
"Kier cuts more jobs as net debt spikes"
.
Construction News
. Retrieved
1 July
2020
.
- ^
"Kier posts £225m loss"
.
The Construction Index
. 17 September 2020
. Retrieved
17 September
2020
.
- ^
"Why the Kier share price crashed 15% on Monday"
.
IG
. 22 September 2020
. Retrieved
8 April
2021
.
- ^
Morby, Aaron (19 January 2021).
"Kier continues to battle with high debts"
.
Construction Enquirer
. Retrieved
19 January
2021
.
- ^
Rogers, Dave (1 March 2021).
"Speculation grows Kier will use April results date to announce housing sale"
.
Building
. Retrieved
1 March
2021
.
- ^
Kleinman, Mark (6 April 2021).
"Kier on brink of housebuilding arm sale to financier Hands"
.
Sky News
. Retrieved
6 April
2021
.
- ^
Prior, Grant (16 April 2021).
"Kier agrees sale of housing business for £110m"
.
Construction Enquirer
. Retrieved
19 April
2021
.
- ^
"Kier sells house-building arm to Guy Hands"
.
The Construction Index
. 19 April 2021
. Retrieved
19 April
2021
.
- ^
"Kier Living homes in on fresh era after £110 million sale completes | Business Weekly | Technology News | Business news | Cambridge and the East of England"
.
www.businessweekly.co.uk
. Retrieved
13 July
2021
.
- ^
Rogers, Dave (19 April 2021).
"Analysts eye details on more cash-raising measures as Kier prepares to unveil half-year results"
.
Building
. Retrieved
19 April
2021
.
- ^
Morby, Aaron (21 April 2021).
"Kier back in profit and plans £240m fund raise in weeks"
.
Construction Enquirer
. Retrieved
21 April
2021
.
- ^
Morby, Aaron (13 May 2021).
"Kier launches £241m fund raise to pay down debt"
.
Construction Enquirer
. Retrieved
13 May
2021
.
- ^
Prior, Grant (16 September 2021).
"Kier returns to profit after two-year turnaround"
.
Construction Enquirer
. Retrieved
16 September
2021
.
- ^
Morby, Aaron (20 January 2022).
"Kier more than halves debts to below £200m"
.
Construction Enquirer
. Retrieved
20 January
2022
.
- ^
Morby, Aaron (18 January 2022).
"Kier reported to be in talks to buy Tilbury Douglas"
.
Construction Enquirer
. Retrieved
18 January
2022
.
- ^
Rogers, Dave (18 January 2022).
"Kier signals growth ambition with £50m move for Tilbury Douglas"
.
Building
. Retrieved
18 January
2022
.
- ^
Kleinman, Mark (21 March 2022).
"Kier demolishes plan for £50m takeover of rival Tilbury Douglas"
.
Sky News
. Retrieved
22 March
2022
.
- ^
Morby, Aaron (21 November 2022).
"Kier shareholders rebel over chief executive's pay rise"
.
Construction Enquirer
. Retrieved
21 November
2022
.
- ^
Banks, Charlotte (4 September 2023).
"Kier buys Buckingham rail division for £9.6m"
.
Construction News
. Retrieved
5 September
2023
.
- ^
Morby, Aaron (18 January 2024).
"Kier slashes net debt by £100m to £140m"
.
Construction Enquirer
. Retrieved
18 January
2024
.
- ^
Weinfass, Iain (1 March 2024).
"Kier rejoins FTSE 250 index"
.
Construction News
. Retrieved
7 March
2024
.
- ^
Morby, Aaron (7 March 2024).
"Kier reinstates dividend after strong profit growth"
.
Construction Enquirer
. Retrieved
7 March
2024
.
- ^
Morby, Aaron (9 August 2021).
"Kier restructures construction operations"
.
Construction Enquirer
. Retrieved
10 August
2021
.
- ^
"Highpoint I"
. Engineering Timelines. Archived from
the original
on 28 September 2011.
- ^
"Gatwick Airport North Terminal Development"
(PDF)
. Entech. Archived from
the original
(PDF)
on 6 October 2011.
- ^
Nicholas Hildyard (10 July 2002).
"The Lesotho Highland Water Development Project - What Went Wrong? - The Companies"
. The Corner House
. Retrieved
18 August
2008
.
- ^
"PFI Data Sheet - Hairmyres Hospital"
(PDF)
.
Government of Scotland
. Retrieved
18 August
2008
.
- ^
"CTRL Contract 103"
. World Tunnelling. 1 May 2001.
- ^
"Castelpoint: Who will pay?"
.
Daily Echo
. 25 August 2006
. Retrieved
22 August
2012
.
- ^
"Kier given go-ahead on Supreme Court"
. Contract Journal. 4 April 2007.
[
permanent dead link
]
- ^
"Snowhill builder holding steady despite the crunch"
.
Birmingham Post
. 16 May 2008
. Retrieved
18 August
2008
.
- ^
"HS2 contracts worth £6.6bn awarded by UK government"
.
The Guardian
. 17 July 2017
. Retrieved
13 October
2017
.
- ^
"Construction blacklist"
.
ICO
. ICO. Archived from
the original
on 16 April 2015
. Retrieved
7 September
2015
.
- ^
"Construction blacklist compensation scheme opens"
.
BBC News: Business
. BBC. 4 July 2014
. Retrieved
7 September
2015
.
- ^
"Scottish Affairs - Seventh Report Blacklisting in Employment: Final Report"
.
www.parliament.uk
. Scottish Affairs Select Committee
. Retrieved
7 September
2015
.
- ^
"Union sues blacklist ringleaders"
.
The Construction Index
. 4 December 2017
. Retrieved
4 December
2017
.
- ^
Prior, Grant (4 December 2017).
"Unite launches new round of blacklisting legal action"
.
Construction Enquirer
. Retrieved
4 December
2017
.
- ^
Marc Horne (31 December 2017).
"Glasgow fires as devastating as IRA bomb in Manchester, says MP | Scotland"
.
The Times
. Retrieved
2 July
2018
.
- ^
"DG One build inquiry - Dumfries and Galloway Council"
.
www.dumgal.gov.uk
. Retrieved
24 June
2019
.
- ^
Marshall, Jordan (9 October 2018).
"Kier outed as 'poor payer' at parliamentary inqury into small businesses"
.
Building
. Retrieved
9 October
2018
.
- ^
"Late-paying Kier suspended from Prompt Payment Code"
.
The Construction Index
. 4 November 2019
. Retrieved
4 November
2019
.
- ^
Morby, Aaron (20 December 2019).
"Kier Construction reinstated to Prompt Payment Code"
.
Construction Enquirer
. Retrieved
23 December
2019
.
- ^
"Kier Highways and Seddon readmitted to Prompt Payment Code"
.
The Construction Index
. 3 June 2020
. Retrieved
3 June
2020
.
- ^
Garner-Purkis, Zak (13 August 2020).
"Prompt payment redemption for Kier Integrated Services and FM Conway"
.
Construction News
. Retrieved
13 August
2020
.
- ^
"Kier fully reinstated to Prompt Payment Code"
.
The Construction Index
. 17 December 2020
. Retrieved
17 December
2020
.
- ^
Thomas-Alexander, Tiya (16 May 2022).
"Kier criticised for 'unaffordable' roadwork quotes"
.
Construction News
. Retrieved
20 May
2022
.
- ^
Prior, Grant (13 January 2023).
"Kier fined £4.4m after power line strikes on M6 job"
.
Construction Enquirer
. Retrieved
16 January
2023
.
- ^
Lago, Christine (22 June 2023).
"McNicholas among companies that failed to pay minimum wage"
.
Construction Management
. Retrieved
22 June
2023
.
External links
[
edit
]
Wikimedia Commons has media related to
Kier Group
.